
LiftPulse Hardware
Universal 4G VoLTE digital line communicator with built-in, standards-compliant battery backup and high-gain external antenna for more effective signal connectivity.
LiftPulse replaces BT lines for a 4G VoLTE digital line including 5‑min heartbeat, monitored mains & battery, and logged test call reporting in a simple cloud dashboard. Just move the lift phone plug from the BT socket to LiftPulse to get started.
The Line Dead Tone is Coming
All emergency lift phones still running on a fixed BT line will go silent without a digital alternative in place. Openreach has already started migrating exchanges region by region, so the compliance risk is real now.
Live Monitoring
See your entire lift estate on your desktop or phone.
The 30-Day Trial
Prove it on one lift before you roll out. A 30‑day, plug‑and‑play trial on your most problematic or critical lift.
Day 0
We ship a complete, pre-configured system. It replaces your existing BT line in minutes with Plug&Play simplicity.
Days 1–30
Get 30 days of full access to our live cloud dashboard. See heartbeat signals, battery health and test calls in real time.
Day 30
Happy with it? Roll it out across your estate on our OpEx plans. If not, return it.
Why LiftPulse
When LiftPulse goes in, the BT line from the lift moves over. No downtime. No disruption. Nothing in the lift needs to change. Take complete control of lift phone emergency communications with real‑time insight into test call compliance, lift line status, mains power, battery level and network signal from a single cloud dashboard, wherever you are.
Any lift phone Plugs into LiftPulse socket. No rewiring.

LiftPulse 4G VoLTE digital line communicator
Live operator The emergency call goes to your existing alarm receiving centre.
LiftPulse dashboard Every lift, in every building, anywhere, all on your screen.
Fits any lift, any maintainer. Only the BT line changes.
Not “minimal”. None. LiftPulse is live before the line moves across.
Hardware included on the 36-month plans. No capital outlay.
Roams to the strongest UK signal. No single operator to depend on.
Timestamped test calls and power events, exported on demand.
Phone and email, seven days, on a tracked ticket. UK based.
What’s Included
Hardware, connectivity and a realtime system status platform. Engineer-direct phone support, 7 days a week.See how LiftPulse works →

Universal 4G VoLTE digital line communicator with built-in, standards-compliant battery backup and high-gain external antenna for more effective signal connectivity.
Global multi-network roaming SIM that automatically locks onto the strongest signal, so no single operator is a point of failure.
24/7 real-time visibility: heartbeat status, mains power loss and restore, battery level, and compliance audit export.
Pricing
Hardware included on orders of 6+ lifts, across single or multiple properties, with LiftPulse 36‑month OpEx service plans.
6–15 lifts · 36 months
For a block or a small amount of buildings.
Hardware included, no upfront costs
Or buy the hardware upfront for a lower monthly rate.
16–50 lifts · 36 months
For Property Managers and owners running several sites.
Hardware included, no upfront costs
Or buy the hardware upfront for a lower monthly rate.
51+ lifts · 36 months
For large estates and housing portfolios.
Hardware included, no upfront costs
Or buy the hardware upfront for a lower monthly rate.
Rates are per lift, set by how many lifts are on your order. The price list has every rate, both ways to pay for the hardware, and how the 30‑day trial converts.
1–5 lifts · 24 months
For a single building or a small block. Our shortest term.
Hardware bought upfront, paid once
Hardware included is available from 6 lifts.
5% discount on the annual fee for upfront payment · Lifetime rolling hardware warranty on all active subscriptions
Every rate is per lift and excludes VAT. The price list is what rollout costs after your trial.
Every rate, emailed to you.
OEM & White Label
The whole LiftPulse platform (portal, alerts and compliance reports) delivered in your company’s livery, ready to sell to your own clients.
Add remote monitoring and EN 81‑28 compliance reporting to every service contract you hold, on a portal that carries your name, not ours.
Give landlords and portfolio clients a branded visibility dashboard across every building you manage.
Bundle lift monitoring into your managed-services stack. We run the hardware, SIMs and platform. You own the client relationship.
If your question is not answered
below, please ask us.
No. Qualifying volume is based on the total units on a single contract order: lifts do not need to be in the same building, or even the same town. A managing agent with three lifts across four sites qualifies exactly the same as one building with twelve.
Our system is brand-agnostic. Installing our unit gives you total freedom. If you switch lift maintenance contractors later, you keep your comms system. Don’t get locked into proprietary hardware.
Check your existing terms with your incumbent provider, but LiftPulse replaces the BT line and nothing else. We don’t touch the lift, the controller, or the emergency phone itself. The phone you already have keeps working exactly as it does today, it simply stops depending on a copper line. In effect we supply the line, not a change to the lift.
Not for a lift. A digital voice line runs over your broadband router and mains power, so in a power cut, precisely when someone is most likely to be trapped, it stops working unless that router has its own battery backup. Most lift machine rooms have no broadband at all. LiftPulse runs on the mobile network with its own standards-compliant battery backup, so the lift line keeps working when the building doesn’t.
Because you can no longer order a new analogue line or move an existing one: Openreach’s stop-sell has been nationwide since 2023. Any refurbishment, new lift, line fault or relocation strands you on the day it happens. Exchanges also migrate region by region well ahead of the final date, not on it. The lifts that get caught out are the ones waiting for a letter.
The most common worry, and the easiest one to settle. Every unit ships with a high-gain external antenna built for deep shafts and basements, and a multi-network roaming SIM that locks onto whichever operator is strongest rather than being tied to one. If you’re unsure, run the 30-day trial on your most difficult lift. That is exactly what it is for, and if the signal isn’t there the unit goes back and the £295+VAT deposit is refunded in full.
That caution is well earned. Many units sold as “GSM” were 2G or 3G only, and 3G has now been retired across every UK network. LiftPulse is 4G VoLTE, the technology the networks are consolidating onto rather than retiring from, and the roaming SIM means you are not tied to any single operator’s timetable.
Whoever you choose. The unit dials any number you nominate: your own facilities desk, the alarm receiving centre you already use, or a third-party answering service. We place no restriction on where the alarm lands and tie you to no particular provider. Worth remembering that EN 81-28 expects the alarm to reach a permanently attended point, so whichever route you pick needs to be covered around the clock.
Up to 4 hours on standby, and around an hour of live talk time. EN 81-28 expects the alarm to remain operable for at least an hour after mains failure, so the standby figure gives you four times the margin the standard asks for.
You wouldn’t have to notice. Each unit sends a regular heartbeat and places an automated test call every three days, and the dashboard flags a missed heartbeat, a mains power loss or battery degradation as it happens. A dead line reaches you as an alert, not as a trapped passenger.
You get direct login credentials to our cloud portal. Pull automated, timestamped reports showing every 3-day test call, heartbeat and power event across your estate, instantly.
For orders of 6 or more lifts across your portfolio, there is nothing to fund upfront. Our zero-upfront models cover the hardware, battery, antenna, SIM and software under a single, predictable OpEx fee.
You commit for the initial term shown on the plans: 24 or 36 months. After that it continues on the same terms rather than being repriced, and 60 days’ notice before a renewal date ends it. No renegotiation, and none of the renewal price rises this industry is known for.
It transfers. If the building changes hands or the management contract moves, we roll the subscription over to the incoming owner or agent, with no cancellation, no reinstallation, nothing to unpick. The unit stays where it is and keeps working.
Simply notify us via our returns form and we’ll send a courier to collect the goods.
Submit the form below to start. A solutions engineer will contact you to discuss the order process, the plug-and-play kit is delivered to replace the BT line on your chosen lift, and the 30-day trial begins.
Place a 30‑day trial order, or send us your details and we’ll be in touch.
or
Thanks, we’ve got your details, we’ll be in touch shortly.
Don’t want to wait?
Place your trial order